H.R. 626

119th Congress

In Committee

Northwest Energy Security Act

Sponsored byRepublican:Rep. Newhouse, Dan [R-WA-4]WA· Introduced 22 janvier 2025

3

Cosponsors

5

Actions

0

Amendments

0

Committees

Since introduced

Introduced
Committee
Passed Chamber
Passed Both
Enacted
Step 1 of 0
Latest action

Referred to the Subcommittee on Water Resources and Environment.

23 janvier 2025·1 year ago

Summary

Introduced in House · Updated 7 août 2025

Northwest Energy Security Act

This bill requires Federal Columbia River Power System (FCRPS) operations to be consistent with the preferred alternative in a 2020 environmental impact statement (EIS) decision that focuses on the operations, maintenance, and configuration of dams in the system rather than wild fish restoration. The system includes dams in the Columbia and Snake rivers in Oregon, Washington, Montana, and Idaho.

Specifically, the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers must operate the FCRPS consistent with the Columbia River System Operations Environmental Impact Statement Record of Decision dated September 2020. Thus, Reclamation, the Bonneville Power Administration, and the Army Corps must follow the EIS rather than the 2023 Resilient Columbia Basin Initiative—and a supplemental EIS proposed in 2024—that focus on wild fish restoration in the Columbia Basin.

The EIS decision may be amended if each agency determines that (1) changes are necessary for public safety or electrical grid reliability, or (2) certain requirements in the decision are no longer necessary.

Further, the bill requires statutory authorization for any structural modification, action, study, or engineering plan that (1) restricts FCRPS hydroelectric dam generation; or (2) limits navigation on the Snake River in Washington, Oregon, or Idaho.

Timeline

5 actions

  1. Referred to the Subcommittee on Water Resources and Environment.

    23 janvier 2025 · Committee

  2. Referred to the Committee on Natural Resources, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.

    22 janvier 2025 · IntroReferral

  3. Referred to the Committee on Natural Resources, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.

    22 janvier 2025 · IntroReferral

  4. Introduced in House

    22 janvier 2025 · IntroReferral

  5. Introduced in House

    22 janvier 2025 · IntroReferral

Sponsorship

3 cosponsors

Sponsor

Republican:Rep. Newhouse, Dan [R-WA-4]WA

Cosponsors

  • Republican3100%

Classification

Policy area

Water Resources Development

Legislative subjects

Alternative and renewable resourcesDams and canalsElectric power generation and transmissionIdahoLakes and riversMontanaOregonWashington State
Pelosi Tracker
© 2026 - Tous droits réservés. Propulsé par Vantara Labs
Ce site web est une plateforme indépendante et tierce. Il n'est pas affilié à, approuvé par ou associé de quelque manière que ce soit à Nancy Pelosi, son bureau ou ses représentants. Toute utilisation de son nom est uniquement à des fins de discussion d'informations publiques disponibles.Les informations fournies sur ce site web sont uniquement à des fins informatives et éducatives et ne sont pas destinées à servir de conseils financiers ou d'investissement, ni ne doivent être interprétées comme tels. Les données présentées ici proviennent de déclarations et dossiers publics. Bien que nous nous efforcions d'assurer l'exactitude, l'actualité et l'exhaustivité, nous ne garantissons pas que toutes les informations sont exemptes d'erreurs ou à jour.Le support est disponible en anglais. Certaines traductions sont automatiques.