H.R. 1047

119th Congress

In Committee

GRID Power Act

Sponsored byRepublican:Rep. Balderson, Troy [R-OH-12]OH· Introduced 6 février 2025

17

Cosponsors

22

Actions

1

Amendments

2

Committees

Since introduced

Introduced
Committee
Passed Chamber
Passed Both
Enacted
Step 1 of 0
Latest action

Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

19 septembre 2025·10 months ago

Summary

Introduced in House · Updated 17 avril 2026

Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act 

This bill requires the Federal Energy Regulatory Commission (FERC) to issue and periodically review a rule that revises the approval process for interconnection requests of generating units that produce electricity to prioritize dispatchable power projects (e.g., certain fossil fuel projects). 

Under the bill, dispatchable power generally refers to an electric energy generation resource, such as a generating unit that produces electricity from fossil fuels, capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. Currently, FERC receives interconnection requests from those projects and other generating units, such as units that produce electricity from renewable energy. Interconnection requests are requests from generating units to connect to the high voltage transmission lines of the electric grid.

First, the rule must address the efficiency and effectiveness of the existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably. 

Second, the rule must revise the pro forma Large Generator Interconnection Procedures, and the pro forma Large Generator Interconnection Agreement as appropriate, to authorize transmission providers to submit proposals to FERC to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue of the provider. FERC must review and approve or deny such proposals within 60 days after the proposal is submitted.

Timeline

22 actions

  1. Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

    19 septembre 2025 · IntroReferral

  2. The previous question was ordered pursuant to the rule.

    18 septembre 2025 · Floor

  3. POSTPONED PROCEEDINGS - At the conclusion of debate on H.R. 1047, the Chair put the question on passage of the bill, and by voice vote, announced that the ayes had prevailed. Mr. Pallone demanded the yeas and nays and the Chair postponed further proceedings until a time to be announced.

    18 septembre 2025 · Floor

  4. Considered under the provisions of rule H. Res. 707. (consideration: CR H4433)

    18 septembre 2025 · Floor

  5. Considered as unfinished business. (consideration: CR H4444)

    18 septembre 2025 · Floor

  6. Rule provides for consideration of H.R. 4922, H.R. 5143, H.R. 5140, H.R. 5125, H.R. 1047, H.R. 3015 and H.R. 3062. The resolution provides for consideration of H.R. 4922, H.R. 5143, H.R. 5140, H.R. 5125, H.R. 1047, H.R. 3015, and H.R. 3062 under a closed rule, and provides for a motion to recommit on each measure.

    18 septembre 2025 · Floor

  7. On passage Passed by the Yeas and Nays: 216 - 206 (Roll no. 279). (text of amendment in the nature of a substitute: CR H4433)

    18 septembre 2025 · Floor

  8. DEBATE - The House proceeded with one hour of debate on H.R. 1047.

    18 septembre 2025 · Floor

  9. Passed/agreed to in House: On passage Passed by the Yeas and Nays: 216 - 206 (Roll no. 279). (text of amendment in the nature of a substitute: CR H4433-4434: 1)

    18 septembre 2025 · Floor

  10. Motion to reconsider laid on the table Agreed to without objection.

    18 septembre 2025 · Floor

  11. Placed on the Union Calendar, Calendar No. 251.

    15 septembre 2025 · Calendars

  12. Rules Committee Resolution H. Res. 707 Reported to House. Rule provides for consideration of H.R. 4922, H.R. 5143, H.R. 5140, H.R. 5125, H.R. 1047, H.R. 3015 and H.R. 3062. The resolution provides for consideration of H.R. 4922, H.R. 5143, H.R. 5140, H.R. 5125, H.R. 1047, H.R. 3015, and H.R. 3062 under a closed rule, and provides for a motion to recommit on each measure.

    15 septembre 2025 · Floor

  13. Reported by the Committee on Energy and Commerce. H. Rept. 119-295.

    15 septembre 2025 · Committee

  14. Reported by the Committee on Energy and Commerce. H. Rept. 119-295.

    15 septembre 2025 · Committee

  15. Committee Consideration and Mark-up Session Held

    25 juin 2025 · Committee

  16. Ordered to be Reported by the Yeas and Nays: 28 - 23.

    25 juin 2025 · Committee

  17. Forwarded by Subcommittee to Full Committee by the Yeas and Nays: 16 - 14.

    5 juin 2025 · Committee

  18. Subcommittee Consideration and Mark-up Session Held

    5 juin 2025 · Committee

  19. Referred to the Subcommittee on Energy.

    3 juin 2025 · Committee

  20. Referred to the House Committee on Energy and Commerce.

    6 février 2025 · IntroReferral

2 earlier actionsView all on Congress.gov

Sponsorship

17 cosponsors

Sponsor

Republican:Rep. Balderson, Troy [R-OH-12]OH

Cosponsors

  • Republican17100%

Classification

Policy area

Energy

Legislative subjects

Electric power generation and transmissionEnergy efficiency and conservationEnergy storage, supplies, demand

Committees

2

  • Energy and Commerce Committee

    House · Standing

    • Referred To6 Feb 2025
    • Markup By25 Jun 2025
    • Reported By15 Sept 2025
    • Energy Subcommittee

      • Referred to3 Jun 2025
      • Markup by5 Jun 2025
      • Reported by5 Jun 2025
  • Energy and Natural Resources Committee

    Senate · Standing

    • Referred To19 Sept 2025

Cosponsor momentum

Cumulative over time

Cosponsors grew from 0 on 6 février 2025 to 17 on 26 août 2025.

Amendments

1

  • HAMDT 108Agreed

    18 septembre 2025

Pelosi Tracker
© 2026 - Tous droits réservés. Propulsé par Vantara Labs
Ce site web est une plateforme indépendante et tierce. Il n'est pas affilié à, approuvé par ou associé de quelque manière que ce soit à Nancy Pelosi, son bureau ou ses représentants. Toute utilisation de son nom est uniquement à des fins de discussion d'informations publiques disponibles.Les informations fournies sur ce site web sont uniquement à des fins informatives et éducatives et ne sont pas destinées à servir de conseils financiers ou d'investissement, ni ne doivent être interprétées comme tels. Les données présentées ici proviennent de déclarations et dossiers publics. Bien que nous nous efforcions d'assurer l'exactitude, l'actualité et l'exhaustivité, nous ne garantissons pas que toutes les informations sont exemptes d'erreurs ou à jour.Le support est disponible en anglais. Certaines traductions sont automatiques.