S. 465

119th Congress

In Committee

GRID Power Act

Sponsored byRepublican:Sen. Hoeven, John [R-ND]ND· Introduced 6 février 2025

3

Cosponsors

3

Actions

0

Amendments

1

Committees

Since introduced

Introduced
Committee
Passed Chamber
Passed Both
Enacted
Step 1 of 0
Latest action

Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366.

15 avril 2026·3 months ago

Summary

Introduced in Senate · Updated 17 avril 2026

Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act

This bill requires the Federal Energy Regulatory Commission (FERC) to issue and periodically review a rule that revises the approval process for interconnection requests of generating units that produce electricity to prioritize dispatchable power projects (e.g., certain fossil fuel projects). 

Under the bill, dispatchable power generally refers to an electric energy generation resource, such as a generating unit that produces electricity from fossil fuels, capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. Currently, FERC receives interconnection requests from those projects and other generating units, such as units that produce electricity from renewable energy. Interconnection requests are requests from generating units to connect to the high voltage transmission lines of the electric grid.

First, the rule must address the efficiency and effectiveness of the existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably. 

Second, the rule must revise the pro forma Large Generator Interconnection Procedures, and the pro forma Large Generator Interconnection Agreement as appropriate, to authorize transmission providers to submit proposals to FERC to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue of the provider. FERC must review and approve or deny such proposals within 60 days after the proposal is submitted.

Timeline

3 actions

  1. Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held.

    15 avril 2026 · Committee

  2. Read twice and referred to the Committee on Energy and Natural Resources.

    6 février 2025 · IntroReferral

  3. Introduced in Senate

    6 février 2025 · IntroReferral

Sponsorship

3 cosponsors

Sponsor

Republican:Sen. Hoeven, John [R-ND]ND

Cosponsors

  • Republican3100%

Classification

Policy area

Energy

Legislative subjects

Electric power generation and transmissionEnergy efficiency and conservationEnergy storage, supplies, demand

Committees

1

  • Energy and Natural Resources Committee

    Senate · Standing

    • Referred To6 Feb 2025
    • Energy Subcommittee

      • Hearings By (subcommittee)15 Apr 2026

Cosponsor momentum

Cumulative over time

Cosponsors grew from 1 on 6 février 2025 to 3 on 28 avril 2025.

Pelosi Tracker
© 2026 - Tous droits réservés. Propulsé par Vantara Labs
Ce site web est une plateforme indépendante et tierce. Il n'est pas affilié à, approuvé par ou associé de quelque manière que ce soit à Nancy Pelosi, son bureau ou ses représentants. Toute utilisation de son nom est uniquement à des fins de discussion d'informations publiques disponibles.Les informations fournies sur ce site web sont uniquement à des fins informatives et éducatives et ne sont pas destinées à servir de conseils financiers ou d'investissement, ni ne doivent être interprétées comme tels. Les données présentées ici proviennent de déclarations et dossiers publics. Bien que nous nous efforcions d'assurer l'exactitude, l'actualité et l'exhaustivité, nous ne garantissons pas que toutes les informations sont exemptes d'erreurs ou à jour.Le support est disponible en anglais. Certaines traductions sont automatiques.